Skip Navigation
This table is used for column layout.
Tolland Town Seal
Spacer

 
Home Page
Spacer
The Town of Tolland, MA
Site Map
Spacer
Modular Homes and Buildings - Additional Requirements
TOWN OF TOLLAND MA
BUILDING DEPARTMENT


MODULAR BUILDING PERMITTING PROCESS

IN ADDITION TO OTHER BUILDING PERMIT APPLICATION STEPS


Prior to Permit Issue - Obtain
  • Building Application signed by Construction Supervisor (per 3508.l.l)
  • Letter of Certification for the Installer (per 3508.l.l) may be CSL of record)
  • Plot/foundation plan
  • The applications and forms required for a Building Permit
  • Manufacturer's plans with cover sheet bearing:
  • Third party approval stamp
  • Massachusetts architect or engineers seal or registration on every page and  plan (2 sets)
  • Massachusetts Building Code BBRS Stamp of Approval (cover sheet only)
  • Plans for any site-built additions
  • Manufacturer’s site installation or set manual (or approved drawings detailing EXACTLY how the building is to be attached to the foundation, supports, girders, and to other boxes)

Initial Inspections
  • The usual site and foundation inspections plus
  • Modular "units", (upon arrival at the site) for BBRS labels and data plate as located on the approved plan and visual inspection for damage or obvious non-compliance with code.
  • Initial placement attachments to be in compliance with the installation manual  or approved connection drawings and an additional inspection for obvious damage or non-compliance with the code

 
Download Adobe Acrobat Reader
Home Page Link
Tolland Town Hall: 241 West Granville Road, Tolland, MA 01034-9403
Phone: (413) 258-4794     Fax: (413) 258-4048     selectmen@tolland-ma.com
Email Subscriber Link
Citizen Comments Link